Straight answers

What people ask before they upload a set.

What does SheetRisk find?
The RFIs in your set: conflicts and disagreements between sheets, numbers the drawings leave out, and sheets or documents the drawings refer to that aren’t in the set. Every item is cited to the sheet and page it came from.
How do we know which items matter most?
Each item is rated high, medium or low impact, so you can go straight to the ones that could move money or schedule.
What do we do with each item?
Send each RFI to your design team, with both statements and every page, or carry it in the number.
Can more than one person work on a job?
Yes. Once a report is unlocked, its owner can give anyone in the job’s contacts read-only or full access, one job at a time. Each person signs in with their own email, everyone sees who else has the job open, and every change shows on the others’ screens with who made it. See who can do what.
What’s free?
Your top potential change order from your first set: the highest-impact conflict SheetRisk’s first read of your set finds, shown in full, plus partial previews of the other items it flagged. No credit card required. You can unlock every item it found, in full, instantly.
What does it cost?
Your top potential change order comes first, free, on your first set, so you see SheetRisk working on your own set. Unlocking every item from the first read is a fixed price by your set’s sheet count, from $99 for up to 25 sheets to $799 for up to 500, shown before you pay. Over 500 sheets, a set gets its own quote. See pricing.
Do we upload the set again?
No. Your set stays in your account for 90 days. Unlocking opens every item from the read you already have, with no new run.
How long does it take?
Your top potential change order is ready within the hour. You can watch the read live, and we email you the link and alert you via text message when it’s ready. Unlocking every item is instant.
What do you need from us?
The current set as PDFs, the full issue with every trade. Add the specs if you have them.
What does it read?
The sheets in the PDFs you send: plans, schedules, notes and details. If a detail is only an image or the specs are still to come, the report lists it, so you know exactly what was covered.
Are our drawings kept private?
Yes. Your files are stored privately and used to read your set. We don’t share them.
Sources
  1. AIA Contract Documents, powered by Catina, The Truth about Change Orders, Research Note Series: Follow the Data. Drawn from 892,457 change orders and 243,120 substantial completion certifications, the study covers 18,229 completed U.S. projects from the last ten years, in 22 building types. On $1 million to $5 million buildings, the average change in cost was 5.04%. The middle 80% of those ranged from a 2.39% decrease to a 15.19% increase, so 1 in 10 rose by more than 15%. Most change orders came in the final half of the project. The note does not break change orders down by cause.
  2. McGraw Hill Construction, Managing Uncertainty and Expectations in Building Design and Construction, SmartMarket Report, 2014. A survey conducted April to May 2014 with 155 owners, 82 architects and 78 contractors. Page 6: “Most owners (80%) say they expect to face added costs from design errors and omissions on their future projects.” These are owners’ expectations, not measured costs.
  3. Office of the New York City Comptroller, A Compilation of Audits of Three City Agencies’ Efforts to Recoup Change Order Costs, Report 7E13-099S, April 8, 2013. Covering the Departments of Design and Construction, Environmental Protection, and Parks and Recreation, it found that “the three audited agencies did not adhere to procedures for recovering over $13 million in change orders” necessitated by design consultant errors and omissions.
  4. Lloyd H. Siegel, Department of Veterans Affairs, “Techniques for Cost and Quality Control: Initiatives at the Department of Veterans Affairs”, in National Research Council, Federal Facilities Beyond the 1990s: Ensuring Quality in an Era of Limited Resources: Summary of a Symposium, The National Academies Press, 1997. From the VA’s analysis of its change orders: “We also discovered specifically that we were paying $1.2 million annually because in many cases no wiring was shown on the drawings between switches and motors.”
  5. Procore, Procore Construction Benchmarks: Setting a new bar for project performance, December 11, 2020. The average time from an RFI being opened to its first response was 7.3 calendar days. The post presents these as industry benchmarks and doesn’t say how many projects they cover.
  6. Keith Molenaar (University of Colorado Boulder) and Bryan Franz (University of Florida), Revisiting Project Delivery Performance, final report, December 2018, supported by the Charles Pankow Foundation and the Construction Industry Institute. A study of 212 U.S. projects completed after 2008. Schedule growth is the change in project duration, from the start of design to final completion, against the duration first contracted. On the 53 design-bid-build projects it averaged 6.29%, with a median of 2.49%.
Your own set

See your top potential change order free.

Upload your set and watch SheetRisk read it. Your top potential change order is ready within the hour, with no credit card required.

Other ways to send your set
On your computer?Email yourself the link, then upload from there. Email Me the Link
Copy the upload linksheetrisk.com/start
Drag and drop your drawing set here PDF or ZIP. Your top potential change order, free.