Page 38 / 72
A second set of eyes before you issue the set.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
It isn’t skill. It’s volume.
A full issue runs to dozens or hundreds of sheets across civil, architectural, structural, mechanical, plumbing and electrical, often on a tight deadline. A small mismatch between a note and a schedule can slip through on the best teams.
SheetRisk reads every sheet and lists where they disagree, so your team can fix the set before it goes out.
What you get
Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.
- Across disciplinesSheet against sheet. Conflicts between civil, architectural, structural, mechanical, plumbing and electrical sheets, with both statements quoted word for word.
- Notes and schedulesWhere they disagree. A general note that says one thing and a schedule that says another, with every page they’re on.
- Missing numbersBlanks and open notes. Blank schedule cells, sizes and ratings left off, and notes that leave a value open.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- Ranked by impactThe big ones first. Each item rated high, medium or low impact, with a question your team can answer quickly.
- A PDF for the teamEasy to pass along. A SheetRisk PDF and a link to share with your team and your consultants.
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
You decide what’s real and what to change.
SheetRisk shows you where the sheets disagree and quotes both. Your team decides which statement is right and fixes the set before it goes out.
- Both statements, quoted word for word
- The sheet and page for each one
- A question ready for your team to answer
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Claims add up.
- 1 in 4
- design firms in one large insurance program face a claim in any year.2024 · Victor Insurance
- 68%
- of contractors say gaps or discrepancies between contract documents come up frequently. 21% of architects say so.2014 survey · McGraw Hill Construction
- 62%
- Rise in the average claim against architects and engineers in one large insurance program’s U.S. book, 2016–2025 against 2006–2015. 19% after inflation.2026 report · Victor Insurance
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.
We’ll only use your number to call you about SheetRisk. Privacy Policy