For construction managers and owner’s reps

Start day one with your RFIs already written.

The leading AI construction drawing reader for the people whose profits depend on it

Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.

Other ways to send your set
On your computer?Email yourself the link, then upload from there. Email Me the Link
Copy the upload linksheetrisk.com/start
Drag and drop your drawing set here PDF or ZIP. Your top potential change order, free.
The problem

Days of flipping sheets while the clock runs.

Building the RFI log by hand means reading every sheet against every other one while the job is already moving. Every question raised mid-job can hold a crew until the design team answers.

SheetRisk reads the set for you and writes each conflict, missing number and missing sheet as a question for the design team, cited to the sheet and page.

What you get

Your report brings together every item SheetRisk’s first read flags, each written up as a question and cited to the sheet and page it came from.

  • Potential RFIsEach one written up. Every conflict, missing number and missing sheet, written as a question for the design team.
  • Word for wordThe drawings’ own words. Both statements quoted exactly as the sheets print them, with every page they’re on.
  • Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
  • Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
  • Ranked by impactFor the owner. Each item rated high, medium or low impact, so the owner sees the potential change orders that matter most.
  • PDF and share linkEasy to pass along. A SheetRisk PDF and a link to share with the owner and the design team.

Watch it read every sheet.

A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.

Before bids go out

Answer it in an addendum, not a change order.

Run the set before bids go out. Send the questions to the design team, and the answers go out in an addendum, so every bidder prices the same thing.

  • Every conflict in the set, before the bid
  • Each one written as a question for the design team
  • Answers in an addendum, not a change order
SheetRisk reads the set

What’s hiding in your drawings?

  • Conflicts
  • Missing numbers
  • Missing documents
  • Two parties
  • Unassigned
  • Coordination
  • Mismatch
  • Quantity
  • Code
  • Scope gap
  • Verify value
  • Clarification
See it right now on a real report
The numbers

RFIs add up.

796
RFIs on the average project.1,362 projects · Navigant Construction Forum
$1,080
Estimated cost to review and answer one RFI.2013 estimate · Navigant Construction Forum
10–30%
Of the way through a job: when the most RFIs get written.2020 benchmarks · Procore
Tell me more
17.2RFIs per $1 million of construction on $5M to $50M projects.1,362 projects · Navigant Construction Forum
$859,680Estimated cost of reviewing and answering the average project’s RFIs.2013 estimate · Navigant Construction Forum
Lost time

Not every problem is a change order. Some just cost you time.

A question with a free answer can still stop the work while everyone waits on it.

Tell me more

It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.

7.3 daysAverage wait for a first reply to a question (RFI). A question raised during construction can hold up a crew until the design team answers. SheetRisk finds the questions in your drawings before bid day, while nothing is waiting on the answer.Procore Construction Benchmarks, 2020
6.3%Past the contracted schedule, on the average design-bid-build project. Every question settled on paper is one less reason for yours to run long.Molenaar and Franz, Revisiting Project Delivery Performance, 2018
The RFI tracker

Send RFIs in a click. Track every one to the answer.

Every item comes written up as a question for your design team, cited to the sheet.

Tell me more
  1. Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
  2. They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
  3. Accept it, or send it back. Accept the answer and share it, or return it with notes.
  4. The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.