The cheapest change order is the one that never happens.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
A budget built on conflicts has gaps in it.
Your budget is only as good as the drawings behind it. When two sheets disagree, or a number is left for later, the gap tends to come back as a change order after the contract is signed.
SheetRisk reads the set your budget is built on and lists every conflict and missing number, so you can settle them, or carry them, before you go to your lender or out to bid.
What you get
Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.
- Ranked by impactPotential change orders, ranked. Each item rated high, medium or low impact, so you know which ones to settle and which to carry in contingency.
- ConflictsTwo sheets, two answers. Sizes, ratings, quantities and notes that change from sheet to sheet, with both statements quoted word for word and every page they’re on.
- Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- A question to sendReady for your architect. Each item written up as a question for your design team.
- PDF and share linkFor your lender and team. A SheetRisk PDF and a link to share with your lender, your partners and your team.
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
Before the bid. Before the lender.
Run it on the set your budget is built on.
- 1
Run the set
Upload the current set when design is ready to price, and see the top potential change order free on your first set.
- 2
Settle the big items
Send each item’s question to your design team, and carry the open ones in contingency.
- 3
Share it
Send the PDF or link to your lender and team before closing, and before the bids go out.
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Overruns add up.
- 31%
- of projects came within 10% of budget over three years.2015 survey of 109 project owners · KPMG
- 4.4%
- Average cost added by change orders on a $10M to $50M building.18,229 U.S. projects · AIA Contract Documents
- 13%+
- Added by change orders on 1 in 10 buildings of $10M to $50M.18,229 U.S. projects · AIA Contract Documents
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.