For franchisees and franchisors

Same prototype. New site. New surprises. Check it before you build.

The leading AI construction drawing reader for the people whose profits depend on it

Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.

Other ways to send your set
On your computer?Email yourself the link, then upload from there. Email Me the Link
Copy the upload linksheetrisk.com/start
Drag and drop your drawing set here PDF or ZIP. Your top potential change order, free.
The problem

The prototype is proven. The site set is new.

A local architect adapts the prototype to your site, and the site sheets and the prototype details can slip out of step. If it surfaces mid-build, you pay for it, with an opening date tied to your lease.

SheetRisk reads every sheet of your location’s set and flags where they disagree, so you can settle it with your architect before the GC prices it.

What you get

Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.

  • Prototype and siteWhere the sheets disagree. Conflicts between the site sheets and the prototype details, with both statements quoted word for word and every page they’re on.
  • Who furnishes whatNo gaps between parties. Items marked by others on one sheet and the contractor’s on another, so you know what’s in the bid before you sign.
  • Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
  • Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
  • Ranked by impactThe big ones first. Each item rated high, medium or low impact, with a question to send your architect.
  • PDF and share linkEasy to pass along. A SheetRisk PDF and a link to share with your franchisor, architect or GC.

Watch it read every sheet.

A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.

For franchisors

Check the prototype once. Then every new location.

Settle a prototype item once, then read each new location’s set before the franchisee breaks ground.

  • Read the prototype set and settle its own conflicts once
  • Read each location’s adapted set before it’s priced
  • Send the report to the franchisee, the architect and the GC
SheetRisk reads the set

What’s hiding in your drawings?

  • Conflicts
  • Missing numbers
  • Missing documents
  • Two parties
  • Unassigned
  • Coordination
  • Mismatch
  • Quantity
  • Code
  • Scope gap
  • Verify value
  • Clarification
See it right now on a real report
The numbers

New sites add up.

12,000+
new franchised businesses projected to open in 2026.2026 outlook · International Franchise Association
3.73
change orders on the average $1M to $5M project.18,229 U.S. projects · AIA Contract Documents
68%
of contractors say gaps or discrepancies between contract documents come up frequently.2014 survey · McGraw Hill Construction
Tell me more
5%Average cost added by change orders on a $1M to $5M building.18,229 U.S. projects · AIA Contract Documents
54%of projects, on average, turn up design omissions.2014 survey · McGraw Hill Construction
Lost time

Not every problem is a change order. Some just cost you time.

A question with a free answer can still stop the work while everyone waits on it.

Tell me more

It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.

7.3 daysAverage wait for a first reply to a question (RFI). A question raised during construction can hold up a crew until the design team answers. SheetRisk finds the questions in your drawings before bid day, while nothing is waiting on the answer.Procore Construction Benchmarks, 2020
6.3%Past the contracted schedule, on the average design-bid-build project. Every question settled on paper is one less reason for yours to run long.Molenaar and Franz, Revisiting Project Delivery Performance, 2018
The RFI tracker

Send RFIs in a click. Track every one to the answer.

Every item comes written up as a question for your design team, cited to the sheet.

Tell me more
  1. Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
  2. They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
  3. Accept it, or send it back. Accept the answer and share it, or return it with notes.
  4. The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.

Request a Call

We’re here to talk through SheetRisk with you and show you the value it adds to your projects. Leave your name and number, and someone on our team will call you.

We’ll only use your number to call you about SheetRisk. Privacy Policy