Page 38 / 72
Find what the drawings missed before it eats your margin.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
Unpriced gaps show up after you bid.
A gap between two trades, or two sheets that don’t agree, is easy to miss on bid day. Found after you’ve signed, it comes out of your margin or turns into a change order conversation.
SheetRisk reads every sheet before you bid, so you can price it, or ask it, while there’s still time.
What you get
Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.
- ConflictsTwo sheets, two answers. Sizes, ratings, quantities and notes that change from sheet to sheet, with both statements quoted word for word and every page they’re on.
- Potential RFIsEach one written up. Every conflict, missing number and missing sheet, written as a question for the design team.
- Scope gapsWork that lands on you. Work handed to one trade on one sheet and to others on another, so it doesn’t land on you unpriced.
- Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- PDF and share linkEasy to pass along. A SheetRisk PDF and a link to share with the owner, the design team and your subs.
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
Price it or ask it. Then send the RFIs on day one.
Run it when the set comes in for pricing.
- 1
Run the set
Upload the set when it comes in for pricing, and see the top potential change order free on your first set.
- 2
Price it or ask it
Carry each item in your number, or send it as a question before bids are due.
- 3
Send the RFIs on day one
The questions are already written, each cited to its sheet and page.
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Gaps add up.
- 68%
- of contractors say gaps or discrepancies between contract documents come up frequently.2014 survey · McGraw Hill Construction
- 48%
- of contractors say design omissions turn up on every project.2014 survey · McGraw Hill Construction
- 14+ hrs
- A week, per project team member, spent dealing with conflict, rework and other problems.2018 survey of 599 industry leaders · FMI and PlanGrid
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.
We’ll only use your number to call you about SheetRisk. Privacy Policy