Page 38 / 72
Find the drawing conflicts now, while the fix is cheap.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
One plan. Every house.
A model plan gets built again and again. A conflict between two of its sheets can come up on every house built from it, until it’s fixed on the plan.
SheetRisk reads every sheet of the plan set and lists where they disagree, so you can fix it once, on paper.
What you get
Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.
- Plan sheetsWhere they disagree. Conflicts between plan sheets, with both statements quoted word for word and every page they’re on.
- Structure and MEPTrade against trade. Structural, mechanical, plumbing and electrical sheets that don’t match each other or the plans.
- Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- Ranked by impactThe big ones first. Each item rated high, medium or low impact, with a question to send your designer.
- PDF and share linkEasy to pass along. A SheetRisk PDF and a link to share with your designer, your team and your trades.
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Fixes add up.
- $1.01B
- Paid in warranty claims in 2025 by 21 U.S. home builders.2026 analysis of builders’ filings · Warranty Week
- 64.4%
- Of the average new home’s price went to construction costs in 2024.2024 survey · NAHB
- 11%
- Average builder profit margin on a new home in 2024.2024 survey · NAHB
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.
We’ll only use your number to call you about SheetRisk. Privacy Policy