Page 38 / 72
Most claims start as a conflict on a sheet. Catch it earlier.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
Run it before the set is issued.
A quick read of the set, while every fix is still on paper.
- 1
Upload before issue
The firm uploads the set before it goes out for permit or bid.
- 2
Settle each item
Each conflict comes with both statements and its sheets, so the team can fix the set.
- 3
Keep the record
The dated PDF shows what the read found, and when.
What you get
A SheetRisk report brings together every item its first read flags, each with the drawings’ own words and the sheet and page it came from.
- ConflictsTwo sheets, two answers. Sizes, ratings, quantities and notes that change from sheet to sheet, with both statements quoted word for word and every page they’re on.
- Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- Ranked by impactThe big ones first. Each item rated high, medium or low impact.
- A question to sendReady for the design team. Each item written up as a question the firm can answer before the set is issued.
- A dated PDFA record of the check. A dated SheetRisk PDF of what the read found, and a link to share.
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Claims cost more than they used to.
- Top cause
- Errors and omissions in contract documents topped the list of causes of construction disputes in North America in 2024.2025 report · Arcadis
- 60%
- of A&E insurers saw claims grow more severe in 2025, up from 41% in 2023.2026 survey of 15 insurers · Ames & Gough
- 62%
- Rise in the average A&E claim in one large program’s U.S. book, 2016–2025 against 2006–2015. 19% after inflation.2026 report · Victor Insurance
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.
We’ll only use your number to call you about SheetRisk. Privacy Policy