For lenders and private funders

Before you wire the money, see where the drawings disagree.

The leading AI construction drawing reader for the people whose profits depend on it

Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.

Other ways to send your set
On your computer?Email yourself the link, then upload from there. Email Me the Link
Copy the upload linksheetrisk.com/start
Drag and drop your drawing set here PDF or ZIP. Your top potential change order, free.
The problem

The budget rests on the drawings.

A loan is sized to a budget, and the budget is priced from the drawings. When the sheets disagree, the difference tends to come back as a change order after closing.

SheetRisk reads the set behind the budget and lists every conflict and missing number, ranked by impact, before you close or fund a draw.

What you get

Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.

  • Ranked by impactPotential change orders, ranked. Each item rated high, medium or low impact, so the ones that could move the budget come first.
  • ConflictsTwo sheets, two answers. Sizes, ratings, quantities and notes that change from sheet to sheet, with both statements quoted word for word and every page they’re on.
  • Who carries itIn the price, or outside it. Work carried in the contractor’s bid on one sheet and by others on another, so you can see what’s in the contract price.
  • Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
  • Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
  • PDF and share linkFor the file and the borrower. A dated SheetRisk PDF for the loan file, and a link to share with the borrower.

Watch it read every sheet.

A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.

SheetRisk reads the set

What’s hiding in your drawings?

  • Conflicts
  • Missing numbers
  • Missing documents
  • Two parties
  • Unassigned
  • Coordination
  • Mismatch
  • Quantity
  • Code
  • Scope gap
  • Verify value
  • Clarification
See it right now on a real report
The numbers

Budgets move.

1 in 10
$1M to $5M buildings where change orders added more than 15%.18,229 U.S. projects · AIA Contract Documents
31%
of projects came within 10% of budget over three years.2015 survey of 109 project owners · KPMG
$60.1M
Average value of a construction dispute in North America in 2024.2025 report · Arcadis
Tell me more
24%of owners have a standard process for sizing a project’s contingency.2014 survey · McGraw Hill Construction
2nd halfOf the job: when most change orders arrive.18,229 U.S. projects · AIA Contract Documents
Lost time

Not every problem is a change order. Some just cost you time.

A question with a free answer can still stop the work while everyone waits on it.

Tell me more

It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.

7.3 daysAverage wait for a first reply to a question (RFI). A question raised during construction can hold up a crew until the design team answers. SheetRisk finds the questions in your drawings before bid day, while nothing is waiting on the answer.Procore Construction Benchmarks, 2020
6.3%Past the contracted schedule, on the average design-bid-build project. Every question settled on paper is one less reason for yours to run long.Molenaar and Franz, Revisiting Project Delivery Performance, 2018
The RFI tracker

Send RFIs in a click. Track every one to the answer.

Every item comes written up as a question for your design team, cited to the sheet.

Tell me more
  1. Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
  2. They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
  3. Accept it, or send it back. Accept the answer and share it, or return it with notes.
  4. The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.

Request a Call

We’re here to talk through SheetRisk with you and show you the value it adds to your projects. Leave your name and number, and someone on our team will call you.

We’ll only use your number to call you about SheetRisk. Privacy Policy