Catch the conflicts before the GC does, so the change orders never happen.
The leading AI construction drawing reader for the people whose profits depend on it
Every page analyzed four ways, then cross-checked by multiple AI models, in 18 steps. Conflicts, gaps and missing sheets flagged, before you go to bid or sign your next contract.
Other ways to send your set
Bid, level, sign. Then the RFIs start.
You get bids, level them and sign with a GC. Then the questions start: a detail doesn’t match the plan, two sheets give two sizes, a note says one thing and the schedule another. Each one can become a change order, and the owner pays for it.
SheetRisk reads every sheet of your set before you sign, so each conflict is a question for your architect while the answer is still free.
What you get
Your report brings together every item SheetRisk’s first read flags, each with the drawings’ own words and the sheet and page it came from.
- ConflictsTwo sheets, two answers. Sizes, ratings, quantities and notes that change from sheet to sheet, with both statements quoted word for word and every page they’re on.
- Missing numbersBlanks to fill in. Blank schedule cells, and sizes and ratings left off, so you can ask for them before the price is set.
- Missing documentsSheets you don’t have. Sheets, details and documents the drawings refer to that aren’t in the set, with every reference to them.
- Ranked by impactThe big ones first. Each item rated high, medium or low impact, so the potential change orders that could move your budget come first.
- A question to sendReady for your architect. Each item written up as a question for your design team, to settle on paper before the price is locked.
- PDF and share linkEasy to pass along. A SheetRisk PDF and a link to share with your architect, construction manager or lender.
Watch it read every sheet.
A sample run, replayed at 40× speed. Scroll inside it to see all 18 steps. You can watch yours live.
What’s hiding in your drawings?
- Conflicts
- Missing numbers
- Missing documents
- Two parties
- Unassigned
- Coordination
- Mismatch
- Quantity
- Code
- Scope gap
- Verify value
- Clarification
Change orders add up.
- 1%
- of owners have ever seen a perfect set of drawings.2014 survey · McGraw Hill Construction
- 54%
- of projects, on average, turn up design omissions.2014 survey · McGraw Hill Construction
- 7–11%
- of total construction cost: what rework averages on a project, counting direct and indirect costs.2012 review of rework studies · Navigant Construction Forum
Tell me more
Not every problem is a change order. Some just cost you time.
A question with a free answer can still stop the work while everyone waits on it.
Tell me more
It may never become a change order, but you pay for the time: more loan interest, more insurance, and a later day to open or start collecting rent.
Send RFIs in a click. Track every one to the answer.
Every item comes written up as a question for your design team, cited to the sheet.
Tell me more
- Write it from the conflict. Click + RFI Log on a confirmed conflict. RFI-001 opens with the question already written and the drawing quotes attached.
- They answer from their own link. Each person gets their own link by email, sent under your name. No account, no sign-in.
- Accept it, or send it back. Accept the answer and share it, or return it with notes.
- The log keeps score. Every RFI on the job in one place: whose court it’s in, when it’s due, and the cost and schedule impact.